
To complete the process of planning and measuring the customer is requied to provide information about the location of the building, the temperature and the annual energy requirement. A geologist will then verify the feasibility of the project, which depends on factors such as the geological and geothermal situation of the zone.
Aerial pictures allow a first evaluation of the building site reguarding disruptions. Maps created by the departements for geo research... more
If the required performance is higher than 30 kW it is necessary to control the effective heat capacity ... more
This test allows us to measure the exact temperature all along the probe length. The device called NIMO-T ... more
To ensure the optimal functionality of the geothermal system, the boiler room has to be adjusted for the low temperatures ... more
Geoliving has already built more than 170 geothermal plants in Italy and Switzerland... more
The geothermal water-water-systems or open loop systems drain water from a well or a superficial water... more
The helix probes require a drilling depth of only 3-6 meters compared to the 100-300 meters... more
Our company is capable of calculationg, planning and assembling an elevated number of collectors in large fields.
It is of fundamental importance to respect the correct distance between the collectors and to be aware of the geometry of the piping to the manifold... more
The interconnecting piping is realized using special PE100 tubes. Installing the piping near the surface... more
The manifolds connect the geothermal probes to the heat pump. Their key task is to distribute, regulate and control ... mehr
We ensure the delivery of the heat pumps, boilers and distributors; leading brands, outstanding quality.
The start-up of the installation is performed first-hand by our company and, if necessary... more